Overview

The tooth is the wear item: it takes the impact so the bucket lip does not. Everything in this range is cast, heat treated and machined under one roof in Ningbo, then checked for pin-hole alignment and wear-face hardness before it is packed. This family lists 12 references, and several can share one container.

LHD Wear Parts Corner Shroud 69039974

Q: What are the main products of your company?A: We focus on high quality wear parts used on bucket, such as bucket teeth, adapter, protector, heel block, shroud, half arrow, cutting edge, end bit, chocky bars, which are covering both construction and mining models for CAT , Komatsu , Hitachi , Hyundai, Doosan, Case, etc.
Q: What’s your MOQ?
A: If we have the products in stock, it won’t be MOQ. If need to produce, we can discuss the MOQ accordingly.
Q: What is your term of payment?
A: For new clients, our payment terms is T/T 30% down payment when place the order and T/T 70% balance upon the B/L copy.
Q: How can we get a quote?
A: Contact us with specification: such as machine model, part number, even product’s picture is fine.
Q: Which certificate do you have?
A: ISO9001, ISO14001, ISO45001.

What you get

  • Cast, heat treated and machined under one roof, with batch traceability.
  • Through-hardened wear face and tip — not a surface coating.
  • Pin holes, retainer grooves and adapter contact faces checked against the drawing.
  • Wooden case or pallet packing, marked with reference and batch for distributor stock.
  • Mixed containers available — several references can share one shipment.

Fitment

Before ordering, send a photo of the adapter nose together with the reference. We confirm tooth profile and pin size before the order is released — similar-looking teeth from different systems do not interchange, and pin diameters differ between them.

Buying questions

Can I order a single piece to test?
Stock references ship from one piece. Trial orders go through the same inspection as production batches.
Do you provide a material or hardness report?
Yes. Tell us the end use when ordering and we send the batch material and hardness record with the shipment.
What is the lead time?
Stock references and production runs differ. The quotation states a date for your reference and quantity rather than a generic estimate.