Overview

The tooth is the wear item: it takes the impact so the bucket lip does not. Everything in this range is cast, heat treated and machined under one roof in Ningbo, then checked for pin-hole alignment and wear-face hardness before it is packed. This family lists 11 references, and several can share one container.

Mining Spare Parts Casting Loader Half-Arrow 113-3140

FAQ:
Q: What kind of products do you provide?
A: We are expert in designing and making ground engaging tools, such as bucket tooth, adapter, cutting edge, grader blade, wear bar, chocky bar, bolt, nut and pin, we have more than 5000 items in our stock.
Q. How your qualities guarantee?
A:We have 100% quality guarantee to customers. We will be responsible for any quality problem.
Q. Can you accept OEM order?
A: Yes, we have done many OEM orders for many clients. Show us your artwork, material, design, package requirements, custom logo, etc, and we will make it for you.
Q: How long is your delivery time?A: Generally, the delivery time is about 30days after order confirmation. But, if we have the goods in stock, it will only take 3-4days for us to do repainting and packing.

What you get

  • Cast, heat treated and machined under one roof, with batch traceability.
  • Through-hardened wear face and tip — not a surface coating.
  • Pin holes, retainer grooves and adapter contact faces checked against the drawing.
  • Wooden case or pallet packing, marked with reference and batch for distributor stock.
  • Mixed containers available — several references can share one shipment.

Fitment

Before ordering, send a photo of the adapter nose together with the reference. We confirm tooth profile and pin size before the order is released — similar-looking teeth from different systems do not interchange, and pin diameters differ between them.

Buying questions

Can I order a single piece to test?
Stock references ship from one piece. Trial orders go through the same inspection as production batches.
Do you provide a material or hardness report?
Yes. Tell us the end use when ordering and we send the batch material and hardness record with the shipment.
What is the lead time?
Stock references and production runs differ. The quotation states a date for your reference and quantity rather than a generic estimate.