Overview

The tooth is the wear item: it takes the impact so the bucket lip does not. Everything in this range is cast, heat treated and machined under one roof in Ningbo, then checked for pin-hole alignment and wear-face hardness before it is packed. This family lists 15 references, and several can share one container.

Loader Bucket Spare Parts Lip Shroud WS-200

FAQ
Q: Can we use our own logo?
A: Yes, we can cast your private logo if you meet our MOQ.
Q: How many packaging ways do you have?
A: Usually, we have two packaging ways: plywood case for most GET parts, and plywood pallet for cutting edge & end bit with long dimensions.
Q: What’s your MOQ?
A: If we have the products in stock, it won’t be MOQ. If need to produce, we can discuss the MOQ accordingly.
Q: Could you supply a sample for testing ? Is it free? A: We can supplya free sample with small value, while for big ones,usually we charge half value for sample testing.
Q: How to contact, negotiate and cooperate with Refue?
A: Kindly contact Refue’s international sales team by Email,Telephone and other efficient communication way.

What you get

  • Cast, heat treated and machined under one roof, with batch traceability.
  • Through-hardened wear face and tip — not a surface coating.
  • Pin holes, retainer grooves and adapter contact faces checked against the drawing.
  • Wooden case or pallet packing, marked with reference and batch for distributor stock.
  • Mixed containers available — several references can share one shipment.

Fitment

Before ordering, send a photo of the adapter nose together with the reference. We confirm tooth profile and pin size before the order is released — similar-looking teeth from different systems do not interchange, and pin diameters differ between them.

Buying questions

Can I order a single piece to test?
Stock references ship from one piece. Trial orders go through the same inspection as production batches.
Do you provide a material or hardness report?
Yes. Tell us the end use when ordering and we send the batch material and hardness record with the shipment.
What is the lead time?
Stock references and production runs differ. The quotation states a date for your reference and quantity rather than a generic estimate.